|
Pages: [1]
|
 |
|
Author
|
Topic: Ultra-Sonic Inspection Trial Fears (Read 1220 times)
|
|
Lee
|
The downgrading of remedial action to track defects as part of a trial of a newultra-sonic track-testing regime poses a serious safety risk to rail staff and passengers, according to the RMT (link below.) http://www.rmtbristol.org.uk/2008/04/ultrasonic_inspection_trial_ra.html#moreThey have asked the railways inspectorate to investigate the 12-month trial, already under way in northeast England. The inspectorate is already investigating evidence gathered by the union that the ultra-sonic train misses some track defects altogether and should not be relied upon to the exclusion of other inspection methods.
|
|
|
|
|
Logged
|
|
|
|
|
|
Pages: [1]
|
|
|
 |