|
Pages: [1]
|
 |
|
Author
|
Topic: Port of Liverpool Freight Rail Link "A Step Closer" (Read 1802 times)
|
|
Lee
|
A £7.6m plan to reopen a rail link between the Port of Liverpool and the West Coast Mainline is a step closer , according to travel chiefs (link below.) http://news.bbc.co.uk/1/hi/england/merseyside/6293306.stmThe stretch of line known as the Olive Mount Chord links the route to Bootle with the London to Manchester line. A display of the scheme is on show at Wavertree Library until the end of July. If approved , Merseytravel hopes to begin work later in 2007 with completion expected by the end of 2008.
|
|
|
|
|
Logged
|
|
|
|
|
|
|
|
|
|
Pages: [1]
|
|
|
 |